Evidence ledger.
The reasoning behind the brief.

This page keeps the compressed brief inspectable. Each entry names the signal, the planning interpretation, and the source example behind it.

Review concentration

1,974 inline comments642 comments in PR #139596121 changed files

The focused PodGroup record shows a review load that would be easy to under-plan if the team only looked at merge state.

Planning use: reserve reviewer capacity and call out files or domains likely to carry the most coordination.

Open GitHub source

Cross-SIG ownership

9 SIGsAPI changesscheduling changes

The analysis cites PR #136589 as a source example for broad ownership and review boundaries.

Planning use: identify which teams, maintainers, and decision makers need to be involved before the plan hardens.

Open GitHub source

Verification tail

DRA version-skew failing testpost-merge follow-up

Issue #139069 is used as an example of work that belongs in verification and follow-up planning.

Planning use: decide which checks require named owners and where post-merge work must remain visible.

Open GitHub source